South Fork Skokomish Helicopter Transport and Placement of Habitat Logs, Phase VI, Mason Conservation District, Shelton, WA #2026-08
$80,000 to $150,000
Plans
Specs
Link to Appendix C, D & F Files
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Mason Conservation District
450 W Business Park Road
Shelton, WA 98584
accounting@masoncd.org
Contact: Matt Phillips
360-968-3704
mphillips@masoncd.org
Issued by:
www.bxwa.com
Notes:
Also incorporated into the Contract Documents by reference are:
•Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted 32 edition, with Washington State modifications, if any:
https://wsdot.wa.gov/engineering-standards/all-manuals-and-standards/manuals/manual-uniform-traffic-control-devices-mutcd
•Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current 36 edition:
https://wsdot.wa.gov/engineering-standards/all-manuals-and-standards/standard-plans
•2024 Stormwater Management Manual for Western Washington (SWMMWW):
https://ecology.wa.gov/regulations-permits/guidance-technical-assistance/stormwater-permittee-guidance-resources/stormwater-manuals
•2019 Temporary Erosion and Sediment Control Manual, WSDOT:
https://www.wsdot.wa.gov/publications/manuals/fulltext/M3109/TESCM.pdf
Description:
MAJOR BID ITEMS will include: Helicopter Transport and Placement of 102 Habitat Logs, Hour (Hour); and Project Mobilization, Demobilization and Clean Up, Lump Sum (L.S.).